Leading the advanced fabrication worldwide.

At Agility, our main focus lies in delivering top-notch subsea structures. Our product range includes manifolds and flowbases, integrated template structures, foundation structures, protection structures, permanent guide bases (PGB), well jumpers, and part products. We pride ourselves on the quality and reliability of these crucial components.

To meet the demanding requirements of subsea structure fabrication, Agility boasts state-of-the-art facilities in Skien and Tønsberg. Our infrastructure includes separate workshops dedicated to piping assembly, testing, and surface protection. Proximity to the quayside allows for efficient logistics and transportation. With over 2000 qualified welding procedures at our disposal, we can confidently tackle the fabrication of complex manifolds. Furthermore, our experienced workforce brings a wealth of expertise in this specialized field.

Fabrication of Subsea Processing Systems

Main product deliveries

Separation System
Compression System
Power Grid/Generator
Manifolds and Flowbases
Integrated Template Structures
Foundation Structures
Protection Structures
Permanent Guide Bases (PGB)
Well Jumpers
Part Products

Main scope of work

Purchase of structure and piping and fitting materials
Structure assembly, welding and machining
Piping assembly, welding and NDT
Surface Protection and marking
Insulation
Factory Acceptance Test (FAT)
SIT facilities and assistance
Load out and seafastening

Facilities & Capabilities

Own facilities in Skien and Tønsberg
Separate workshops for piping assemblytesting and surface protection
Facilities close to quayside
More than 2000 qualified welding procedures
Workforce with long experience in fabrication of complex manifolds

From our video archive

Take a look at the load out of the separation modules from the Pazflor project back in 2012. Hall C in Tønsberg delivered a base frame for surface treatment. The section weighed 185 tonnes and was lifted in hall C by 4 cranes. The structure must be returned to the hall for final assembly and FAT before handover to the customer. This project is a typical fast track project. Hall C has supplied many such structures.

In the early years our company name was Grenland Group, we had a name change in June 2012 to Agility Group. In 2022 we changed our name to Moreld Agility, and in 2024 to Agility.

Get in touch.

Let us know what we can do for you.